Monorail Switch System

  • Overview:

The rail industry is one of the areas of MAPNA Group’s activity and bears great importance due to the macro policies of Iran for expanding rail network and fleet and also because of its infrastructural role. Qom monorail project is the first monorail plan in the country that was implemented with the aim of developing a modern urban transportation system. Sepahan MAPNA Engineering & Equipment Manufacturing Company designed two types of modular monorail switches for the project for the first time in the West Asian region.

  • Monorail way switch

  • Monorail transfer switch

Track changing in monorails is done through moving bridges called monorail switches. Several mechanisms have so far been developed for that purpose and the segmental method is among the newest and most efficient ones. The modular switch enjoys a unique technology; the force needed to move the set of beams is powered by a drive system consisting of an engine and several gearboxes. The switch is fixed in place in a straight or curved position by means of a locking mechanism.

Technical Characteristics:

Main components of monorail switch include:

Mission

Subsets

Components

Resisting against forces resulting from train’s passage

Beams

Structure

Moving the structure

Engine and gearboxes

Propulsion System

Stabilizing structure’s position

Structure and operator

Lock System

Coordination with control center

Monitoring and controlling switching operation

Sensors, controller, and operators

Control System

Main specifications for designing monorail switch include:

Amount

Parameter

800 (200 for each car)

Train’s passenger capacity (4 cars)

50 tons

Maximum weight of each car

85km/h

Maximum speed of train

30 years

Useful life of Switch

More than 60 million cycles

Number of structure’s loading cycles

  • Way switch

Amount/Desciption

Technical characteristic/title

Converting one line to two lines

Mission

75 seconds

Average intervals between two trains

15km/h

Maximum speed of train while passing the switch on curved position

22m

Length of equipment on place of installation

22.4m

Displacement of the free part of switch

15 seconds

Time for each displacement operation

50 tons

Weight

  • Transfer switch with escape track

Amount/Desciption

Technical characteristic/title

changing track between two lines

Mission

75 seconds

Average intervals between two trains

15km/h

Maximum speed of train while passing the switch on curved position

45m

Length of equipment on place of installation

3.7m

Displacement of the free part of switch

15 seconds

Time for each displacement operation

50 tons

Weight

  • Past projects :

MONORAIL TRACK SWITCHING SYSTEMS

year

QOM

92-95

 

Monorail Track Switching System

Year

Qom

2013-2016